Home › Cost Calculators › Detached ADU Cost Calculator
A separate building in the back yard is the most flexible ADU and the most expensive per square foot. Three things move the price far more than the floor plan does: your elevation, your ground, and how far the trench has to run.
A detached unit is a complete small house. It needs its own foundation, its own roof, its own envelope and its own connection to everything the main house is already connected to. That is why this site publishes small detached units at $120,000 to $220,000, one-bedroom units of 500 to 750 square feet at $180,000 to $320,000, and larger units at $250,000 to $450,000 and beyond. Within any of those tiers the spread is not really about the drawings — it is about the lot the drawings land on.
Washoe County sets the design ground snow load by elevation, and the table is steep: roughly 43 psf below 5,000 feet, 59 psf at 5,100, 92 psf at 5,300, 203 psf at 6,000 and 286 psf at 7,000. A roof engineered for 203 psf is not the 43 psf roof with a surcharge — it is deeper members, more of them, and connections and walls sized to match. Add a 24-inch frost depth, Seismic Design Category D2 and a 120 mph design wind speed and the foundation changes too. This is the largest single reason a Galena ADU does not cost what the same plan costs in Sparks.
Sewer, water, gas and power all have to reach the unit, and they go through whatever is in the way — a driveway, a patio, mature tree roots, sometimes rock. Under 25 feet is a modest line. Over 150 feet, or a property on septic and well rather than sewer and water, is one of the largest single items in the whole budget, because a second dwelling frequently means a new or expanded septic system with its own permit and its own engineering. Ask for this to be broken out separately in any bid, and ask what happens if rock is hit.
A 400 square foot studio still needs a full kitchen, a full bathroom, a heating system, a water heater, an electrical panel and a foundation and roof over all of it. Those costs do not shrink with the floor area, so they spread over fewer square feet. That is why the published tiers are not proportional — doubling from 400 to 800 square feet does not double the price. If you are choosing between a studio and a one-bedroom, the marginal cost of the extra room is usually much lower than the first room was.
This calculator works from the 2026 cost figures published on this site for Reno. What it cannot see is your soil, your slope, how far your utility connections actually run, or what your lot and your HOA will allow. We will come out, walk the property and give you a written scope with no pressure attached.
Book a free consultationThe figures published on this site put a small detached unit under 500 square feet at $120,000 to $220,000, a one-bedroom of 500 to 750 square feet at $180,000 to $320,000, a larger unit of 750 square feet and up at $250,000 to $450,000 and beyond, and a higher-end custom detached unit at $400,000 and up. Independent 2026 figures for northern Nevada put detached backyard ADUs at roughly $300 to $575 and up per square foot, which brackets the same territory. This calculator works from your specific lot rather than an average.
Reno's ordinance, adopted 8 October 2025, requires a minimum lot size of 5,000 square feet and that the ADU be both smaller and shorter than the main house. A cap of 50 percent of the primary dwelling up to 1,200 square feet is commonly cited, along with a height limit around 16 feet and 5-foot side and rear setbacks, but treat those specific figures as unconfirmed and check them against the current ordinance. Nevada's AB 396 sets no statewide size cap, and from 1 July 2026 it prevents local setbacks stricter than those applying to the primary residence.
Because Washoe County's design ground snow load is set by elevation and it climbs steeply — from about 43 psf on the valley floor to 203 psf at 6,000 feet and 328 psf at 8,000. Snow load sizes the roof structure and everything carrying it. Combined with a 24-inch frost depth and Seismic Design Category D2, that means a foothills unit is genuinely a different building from a valley-floor unit with the same floor plan. A builder who quotes without asking your elevation has not priced the job.
Roughly three to six months for permitting according to independent northern Nevada sources, then typically five to eight months on site for a detached unit depending on size, ground and weather. Winter matters here: foundation work in frozen ground and roofing in snow both slow down or stop. The most reliable way to compress the total is a complete set of drawings that gets through plan check first time, which is a design cost rather than a construction one.
Sometimes, and it is one of the larger cost questions on the outskirts of Washoe County. A second dwelling adds load to a system sized for one, so expect a review and frequently a new or expanded system — which carries its own permit, its own engineering and its own soil percolation testing. Budget for it as a major line rather than a detail, and get it assessed before committing to a design, because the answer can change where the unit can sit.
Yes, and this is the exception people are most often caught by. Nevada's AB 396 constrains what local governments may require, but it does not touch private covenants. An HOA's CC&Rs can restrict or prohibit an ADU outright, and no state law currently overrides that. Read the CC&Rs before you spend money on design. This is a common issue in the master-planned communities around Reno — Somersett, ArrowCreek, Montreux and St James Village among them.
Planning the whole project? Start at the Reno ADU calculator hub, or read more about our detached ADU service.